Model NO.
H05VV-F PVC Insulated and Jacketed Flat Cable
Range of Application
Flame Retardant
Certification
UL, RoHS, VDE
Color Available
Any Colors
Delivery Time for Samples
3-5days
Delivery Time for Mass Production
7-10days
Appliance
Electrical Instrument, Power & Automatic Device
Warranty Time
at Least 10years for Proper Use
Standard of Production
RoHS & Reach
Factory Management Standard
ISO9001:2008
Annual Capacity
300,000kms
Transport Package
Coiled in The Plastic Spool
TUV Approved EU EN50618 Standard 2.5Mm2 H05vv F Power Cable
H05VV-F Application Scope :
Available for external & internal wiring of electrical instrument, power device & automatic device without forcible traction. Without direction, at times for movable wiring.
H05VV-F Cable structure:
Conductor: Stranded bare copper or tinned copper in accordance with VDE 0281 Part 5,HD21.5S3 IEC 227-5
Insulation:PVC/TI2 PVC in accordance with DIN VDE 0281.
Color ID:In accordance with HD 402 Standard
Jacket Material:PVC/TM2 PVC
Application Standard: HD21.5, VDE 0281, CEI 20-20/5, CEI 20-35 (EN60332-1), CEI 20-52,CE Low voltage 73/23/EEC & 93/68/EEC
H05VV-F Features & Conformity:
Features : Super fine conductor, flexible for small bending angle . Durable for certain external mechanical forces
In accordance with EU coordination standard
Conformity Approval : RoHS CE
H05VV-F Technical Parameter:
Rated Voltage:2000V In accordance with DIN VDE 0281 Part 2 HD21.2
Min. bending Radius
Fixed Installation: 5×D(Cable OD)
Movable Installation: 8×D(Cable OD)
Temperature Range
Fixed Installation: -20 to +70°C
Movable Installation: -5 to +70°C
Q1: Can I get free sample?
A1: We can provide the existing items samples free in freight collected. If there is any special samples requirement, please contact us for more details.
Q2: How could I pay?
A2: We prefer T/T or L/C at sight. If you prefer other payment terms, please contact us freely.
Q3: What is your packing way? Can I have the customized package?
A3: We have the standard export package. For more details about the customized package, please contact us.
Q4: What is the delivery lead time?
A4: It depends on the order quantities. The mass production lead time is about 7-12 days after receipt of the deposit.
Q5: Are you a factory or a trading company?
A5: We are a factory. We provide all kinds of OEM/ODM services for clients around the world.
Q6:Where is your main market?
A6: We export to the North America, Southeast Asia, Europe, Korea, Japan, and other countries.
Our Services
1. Professional QC and QA team to make sure all products qualified before shipping.
2. Competitive price
3 .Standard package to ensure the safe transportation
4. Professional service
WHY CHOOSE US
1. Production
Qualified production, competitive price, professional service.
2. Technology
Professional R& D team
3. Equipment
With completive testing equipment.
4. Quality
UL/ CE/ FCC/ RoHS/ Reach certificate