Material Shape
Round Wire
Range of Application
Flame Retardant
Color Available
Any Colors
Delivery Time for Samples
3-5days
Delivery Time for Mass Production
7-10days
Appliance
Electric Heating Mats
Warranty Time
at Least 10years for Proper Use
Standard of Production
RoHS & Reach
Factory Management Standard
ISO9001:2008
Annual Capacity
300,000kms
Transport Package
Coiled in The Plastic Spool
AMW ul1887 FEP insulation hook up wire heating resistantPRODUCT DESCRIPTION:
Rated temperature:150ºC
Rated voltage:600V
According to:UL Subject758,UL1581,C22.2
Nickel plating or tin/bare copper conductor
FEP Insulation
Passes UL VW-1&CSA FT1 vertical flame test
Uniform insulation thickness of wire to ensure
easy stripping and cutting
For general purpose internal wiring of appliance
AWG | NO.of Cond (mm) | Conductor resistance 20ºC (Ω/KM) | Conductor Dia (mm) | Insulation Thickness (mm) | Overall Diameter (mm) |
Nom. | Min. | Nom. | Tol. |
10 | 37/0.42 | 3.54 | 2.94 | 0.35 | 0.33 | 3.60 | ±0.15 |
12 | 37/0.374 | 5.64 | 2.62 | 0.35 | 0.33 | 3.32 | ±0.15 |
14 | 19/0.361 | 8.96 | 1.85 | 0.35 | 0.33 | 2.60 | ±0.10 |
16 | 19/0.287 | 14.60 | 1.50 | 0.35 | 0.33 | 2.20 | ±0.10 |
18 | 19/0.235 | 23.20 | 1.18 | 0.35 | 0.33 | 1.90 | ±0.10 |
20 | 19/0.19 | 36.70 | 0.95 | 0.35 | 0.33 | 1.65 | ±0.10 |
22 | 19/0.15 | 59.40 | 0.76 | 0.35 | 0.33 | 1.45 | ±0.10 |
24 | 7/0.2 | 94.20 | 0.61 | 0.35 | 0.33 | 1.30 | ±0.10 |
26 | 7/0.16 | 150.00 | 0.48 | 0.35 | 0.33 | 1.20 | ±0.10 |
28 | 1/0.32 | 227.00 | 0.320 | 0.35 | 0.33 | 1.02 | ±0.10 |
30 | 1/0.254 | 361.00 | 0.254 | 0.35 | 0.33 | 0.96 | ±0.10 |
Q1: Can I get free sample?
A1: We can provide the existing items samples free in freight collected. If there is any special samples requirement, please contact us for more details.
Q2: How could I pay?
A2: We prefer T/T or L/C at sight. If you prefer other payment terms, please contact us freely.
Q3: What is your packing way? Can I have the customized package?
A3: We have the standard export package. For more details about the customized package, please contact us.
Q4: What is the delivery lead time?
A4: It depends on the order quantities. The mass production lead time is about 7-12 days after receipt of the deposit.
Q5: Are you a factory or a trading company?
A5: We are a factory. We provide all kinds of OEM/ODM services for clients around the world.
Q6:Where is your main market?
A6: We export to the North America, Southeast Asia, Europe, Korea, Japan, and other countries.
Our Services
1. Professional QC and QA team to make sure all products qualified before shipping.
2. Competitive price
3 .Standard package to ensure the safe transportation
4. Professional service
WHY CHOOSE US
1. Production
Qualified production, competitive price, professional service.
2. Technology
Professional R& D team
3. Equipment
With completive testing equipment.
4. Quality
UL/ CE/ FCC/ RoHS/ Reach certificate