Certification
ISO9001, CCC, Ce;RoHS
Key Ward
NEMA 8 Stepper Motor
Transport Package
Shipping Time: 15-25 Business Days
Origin
Guangzhou, Guangdong, China
Description:CASUN NEMA8 1.8°20 Hybrid Stepper Motor Two Phase 42mm 300g.cm 0.8A Specification:Brand: CASUNModel: 20SHD0101 Motor length: 42mm
Diameter of axle: 4mm
The front shafr length:10mmSize: 20mm x 20mm x 42mmOutgoing line: 300mm (Plug is not included)Certification: CE,ROHS,ISOScope: 3D Printers, Monitor Equipment, Medical Machinery, Textile Machinery, Packaging Machinery, Stage Lighting, ect.
Genaral Specification:Item | Specifications |
Step Angle | 1.8° |
Temperature Rise | 80ºCmax |
Ambient Temperature | -20ºC~+50ºC |
Insulation Resistance | 100 MΩMin., 500VDC |
Dielectric Strength | 500VAC for 1 minute |
Shaft Radial Play | 0.02Max. (450g-load) |
Shaft Axial Play | 0.08Max. (450g-load) |
Max. radial force | 28N (20mm from the flange) |
Max. axial force | 10N |
Electrical Specification:Model No. | Step Angle | Motor Length | Current/Phase | Resistance/Phase | Inductance/Phase | Holding Torque | # of Leads | Rotor Inertia | Mass |
( °) | (L)mm | A | Ω | mH | g.cm | No. | g.cm | Kg |
20SHD0101 | 1.8 | 42 | 0.8 | 5.4 | 1.5 | 300 | 4 | 2 | 0.08 |
Features: High holding torque at high speed.A stepper motor is an electric motor that is able to create sharp movements.It is widely used in 3D printer, monitor / Medical/Textile/ Packaging Machinery, Stage Lighting,ect.
Operating PrincipleOur stepper motor is made up of rotor,stator, bearing and housing. A certain electric current goes through the stator winding timely, then produces a rotating magnetic field within the motor. Under the action of magnetic suction, the rotor will follow this and creates a rotating magnetic field. The stator and rotor flux in each chain, and then produce rotary torque output.
Warning
Make sure the motor connect to a constant current or chopper drive controller before you test motor.
Connecting the motor directly to a power supply will destroy the motor.
Packaging & Shipping
1. Inner packing(foam packing) + Outer packing(Carton packing)
2. Export wooden case
3. Other package as you required
4. Shipment port: Guangzhou
5. Delivery terms: EXW, FOB, CIF
6. Delivery lead time: normally about 10 days
Our promise to our Customers1. Customer"s inquiry can be replied within 24 hours.
2. Reply to our customer questions & Concerns within 3 working days.
3. Acknowledge Customer purchase orders within 24 hours.
4. Standard Lead time is within 3 weeks. Respond to special product development within 15 weeks.
5. Flexible delivery methods: By air, by sea, express carrier.
6. Create a win-win business relationship with customers from all over the world.