Purchase Qty. / Reference FOB Price | |
---|---|
45 square meter | US $ |
Production Capacity: | 395200 |
---|---|
Payment Terms: |
China Huanghua Port exports fire-resistant container houses to Colorado
Activity rooms and container houses, as commonly used houses on construction sites, are also well-known to everyone. The activity room can be disassembled and assembled, with fast installation speed and simple tool usage, which has been well received by everyone. The activity room is customized by processing the main frame according to a certain size in the factory, and the length of the panels is also processed in the factory. Therefore, when installing on the construction site, it only needs to be installed according to the drawings, and there is little need for on-site processing. This greatly reduces the installation and setup time. In this way, the installation time of the activity room is short, which is equivalent to increasing the construction period in the early stage of the building. So activity rooms are favored by many construction sites. And because it is detachable, the activity room can also be recycled.
Huanghua Port exports fire-resistant container houses to Colorado
Compared to other areas in Linfen, there are still many constructions of color steel houses, activity houses, container houses, etc. In Fushan County, the economy is not very good. Therefore, color steel tiles, color steel houses, composite panels, sandwich panels, activity houses, container houses, and other low cost color steel materials are very popular among people. There is a vast market for color steel tile roofs, color steel single panel color steel sheds, insulated color steel houses, construction site activity rooms, activity room work sheds, color steel room equipment rooms, residential container rooms, epidemic prevention container rooms, and so on. And there is another reason, the production cycle of color steel houses is short. Unlike brick and concrete houses, which start construction in a month, color steel houses take 3-5 days to build, and second floor houses only take a dozen days. Fast installation and simple operation are also competitive advantages.
Contact Us | User Agreement | Privacy Policy | 加入会员
Service Tel: (+86)0571-87774297